This project involved refurbishment of the level 2 carpark entrance to the Centre. It was designed and specified by our Service team in Belfast as it was necessary to take out an older sliding entrance that had a smaller clear passage width due to the manual escape doors incorporated into the fixed side screens. The client wanted a more modern aesthetic with minimal framing. For this reason, we elected to use the GEZE SL Bi-parting fine frame system. We completed the installation of the inner and outer entrance doors in just 4 days, which included removing the existing screens and doors, to minimize disruption to the centre.
Use the form below to search through our range of products and services