157 Townsend Street – Grade A Commercial Office Development, Dublin

157–164 Townsend Street Reception speedlane security systems by KCC Group
157–164 Townsend Street Reception speedlane security systems by KCC Group
157–164 Townsend Street Reception speedlane security systems by KCC Group
  • Location: Dublin, Ireland
  • Architect: MCA Architects
  • Contractor: John Sisk & Son

Project Overview

157 Townsend Street is a landmark Grade A commercial office development in the heart of Dublin city centre. Designed by MCA Architects and constructed by John Sisk & Son, the development delivers premium office accommodation that combines contemporary architecture with high standards of security, accessibility and sustainability.

To support the building’s operational and compliance requirements, the project required an integrated solution combining entrance security, fire-rated glazing, door automation and architectural hardware.

Appointed for its product expertise and installation capability, KCC Group designed, supplied and installed a coordinated package spanning four specialist disciplines. Working closely with John Sisk & Son and the wider project team, KCC ensured every element integrated seamlessly with the building’s fire strategy, access requirements and architectural vision.

The development has since been selected as the future headquarters of Enterprise Ireland, reflecting the quality, sustainability and long-term performance expected from one of Dublin’s newest Grade A office buildings.

Project Requirements

As a premium commercial office development, 157 Townsend Street required a coordinated approach to entrance security, fire protection and accessibility across multiple floors and circulation spaces.

The project required:

  • Secure reception access through integrated speedlane security systems.
  • Fire-rated doors and glazed screen systems that maintained effective fire protection while preserving the building’s modern architectural aesthetic.
  • Automatic door solutions that achieved compliant, Part M accessible operation while supporting the building’s fire strategy.
  • A complete architectural hardware package delivered consistently across the development.
  • Solutions fully compliant with current accessibility and safety standards while integrating with the wider building design.

 

Project Solution

Through early collaboration, technical planning and coordinated delivery, KCC Group provided one integrated solution covering four specialist packages, simplifying project delivery while ensuring consistency across every stage of the installation.

Entrance Security & Access Control

  • Designed, supplied and installed speedlane security systems within the main reception area.
  • Created a secure reception lobby while maintaining efficient day-to-day access for occupants and visitors.
  • Integrated seamlessly with the building’s wider access control and security strategy to support efficient, secure movement throughout the development.
  • Delivered a modern, welcoming reception environment without compromising security or user experience.
Speedlane Systems

Fire-Rated Doors, Glazing & Automation

  • Supplied and installed fire-rated steel doors, glazed screens and automatic swing operators from the ground floor through to the 8th floor lift lobbies.
  • Maintained effective fire protection while preserving the building’s modern architectural design.
  • Enabled compliant, Part M accessible operation while ensuring doors automatically returned to their fire-safe position upon fire alarm activation.
  • Delivered solutions compliant with EN 16005, supporting the building’s fire safety and accessibility strategy.
Fire Rated Glass Doors

Architectural Hardware

  • Supplied a complete architectural ironmongery package across the development.
  • Delivered a coordinated hardware specification to ensure consistency in performance, quality and finish.
  • Integrated the hardware package with the door, glazing and automation systems for seamless project coordination.
  • Provided a single-source solution that simplified installation, reduced interfaces between trades and supported efficient project delivery.
Door Hardware

Project Outcome

The completed development delivers a secure, accessible and fully compliant commercial office environment that balances modern workplace design with long-term operational performance.

KCC Group’s integrated package of speedlane security systems, fire-rated glazing, automatic doors and architectural hardware supports the building’s security, accessibility and fire safety while maintaining a consistent, high-quality finish throughout. Automatic door systems provide compliant, Part M accessible operation while supporting the building’s fire strategy.

Delivered on programme, KCC provided one coordinated solution across four specialist packages, simplifying project delivery and reinforcing its capability as a trusted partner for large-scale commercial developments.