Fit-Out and Interior project solutions

KCC Group are pleased to introduce an informative seminar on Fit-Out and Interior project solutions

For Architects and Designers
A wide and tall glass door with four horizontal sections separated by black steel mullions. On the right-hand side of the door is a solid steel section where a flush door lever is. The door appears to slide into a wall pocket on the left handside
A modern building interior with a full height glazed screen and integrated double glazed door lead into an office area with big external windows overlooking another building. In the foreground of the image on the right is a curved half-height wall and stair-rail leading onto a staircase. On the left are two curved walls with modern timber cladding
Interior of a commercial building looks still unfinished with plastered but not painted walls. Looking at a floor to ceiling height glass screen divided into three sections. On the far left the screen is replaced by a glazed door and slim screen. Two timber doors are visible on the left hand side.
fire curtain operating library
Automatic swing door entrance
Fire-rated and security certified steel substation or switch room doors
automatic sliding door residential building entrance

Providing a comprehensive range of market-leading products and integrated solutions including architectural hardware, specialist glazing, automatic doors, and access control systems, this 45 minute seminar looks at the integrated solutions KCC can offer on fit-out projects from specification through to on-site installation and ongoing maintenance.

Attendees can expect to learn about:

  • Different door automation options for your building needs
  • Integrating different access control systems to enhance security and monitor the flow of people into and around your building
  • The appropriate use and placement of timber and steel doorsets
  • Fire prevention systems such as fire & smoke curtains, fire-rated glazing or fire doors
  • The use of glazed partitioning to create a flexible use of space for building interiors
  • Specialist environment considerations eg. Mental Health facilities, operating theatres, cleanrooms, datacentres
Download Overview Book this seminar

Book Seminar

Fit-Out and Interior project solutions

Book this seminar by filling out the form below.

  • Your Details

  • Seminar Details

How can we help?

If you'd like more information or to discuss your specific needs, please enter your details below and one of our experts will be in touch within 48 hours.

Search the site

Use the form below to search through our range of products and services